NASA Image and Video Library #1 Fan

@nasaimageandvideo.bsky.social

Bringing NASA’s best content to the Bluesky space community

Gateway HALO packaging by Thales Alenia Space In Turin, Italy, technicians prepare Gateway’s HALO (Habitation and Logistics Outpost) for transport. The module’s primary structure will travel to Northrop Grumman’s facility in Gilbert, Arizona, for final outfitting ahead of its launch to lunar orbit.

Bild

Gateway AEPS Thruster Testing by NASA/GRC/Jef Janis NASA GRC has received the first of three AEPS thrusters for the Gateway lunar space station. The thruster will undergo testing before integration with Gateway’s Power and Propulsion Element, launching with the HALO module ahead of Artemis IV.

Bild

Artemis IV hardware in production by NASA/Michael DeMocker The forward skirt is one of five major elements that make up the 212-foot rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft to the Moon.

Bild

Artemis I wet dress rehearsal SLS rollout by NASA/Ben Smegelsky NASA’s Artemis I Moon rocket – carried atop the crawler-transporter 2 – rolls out of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on June 6, 2022, beginning the 4.2-mile journey to Launch Complex 39B.

Bild

Artemis II SLS booster segment by NASA/Frank Michaux Engineers and technicians with NASA’s Exploration Ground Systems Program transfer the right center center segment with the NASA worm insignia to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida on Tuesday, Jan. 14, 2025.

Bild

Crawler-Transporter 2 and Mobile Launcher 1 by NASA/Kim Shiflett The mobile launcher is equipped with a number of lines, called umbilicals, which will connect to NASA's Space Launch System (SLS) and Orion. CT-2 has been upgraded to handle the weight of the mobile launcher with SLS and Orion atop.

Bild