@johnrobson87.bsky.social

Person on a 🚲 in Edinburgh & beyond!

After lengthy repair, the 172m Porto’s Dom Luís I Bridge reopened to public transport, taxis, cyclists & pedestrians only. After lengthy repair, #Edinburgh’s 160m North Bridge reopened with a lane of hatching, no cycling provisions, without widening busy pavements and no traffic reduction measures.

Dom Luís I Bridge is a double-deck metal arch bridge that spans the river Douro between the cities of Porto and Vila Nova de Gaia in Portugal. 

On 27 June 2003, the upper deck was closed to motor traffic in order to adapt the structure for the metro system. The new "D Line" was inaugurated on 18 September 2005, and opened to the metro trams and pedestrian traffic.

The lower deck remained open to general traffic until October 2021, when it closed temporarily to all traffic for the start of repairs and renovation work predicted to last about one year. When it reopened, in April 2023, the lower deck was restricted to public transport, taxis, cyclists and pedestrians.Photo shows North Bridge, four lanes for vehicles (x2 bus lanes, x2 vehicle area) and a fifth for hatching - space that could have been used for wider pavements. 

North Bridge is a bridge in Edinburgh linking the High Street with Princes Street, and the Old Town with the New Town. The current bridge was built between 1894 and 1897.

Rejoice! Edinburgh’s got a new contender for the world’s worst cycle lane! Imagine a dark stormy night 😱 - needs a “cyclist dismount”, “road narrows on left”, “cycle lane closed” or whatever sign. Or maybe make the “keep right”permanent?

#EdTravCyc @spokes.org.uk @edi.bike ⚠️ caution ⚠️ needed on North Bridge headed north. So many raised ironworks and no obvious warning signs (to me at least) could be lethal on a bike if not aware. Also amount of tarmac and road width being reinstated is crazy! No cycle provision or widened pavements

Bild

FYI @spokes.org.uk @edi.bike @sw20.info @livingstreetsedi.bsky.social Also does anyone know if the lane / track via Lymphoy from Currie to Malleny is cyclable? This would avoid the busy Lanark Rd West.

Bild
Water of Leith Conservation Trust@wolct.bsky.social · 2mo ago

Edinburgh Council have informed us they have closed the Walkway at Kinauld Tan Works Footbridge (Approx. Location: w3w.co/minute.guise...) as a hole has appeared in the bridge. There is no through route over this bridge in either direction . It will be closed all weekend diversion via lanark rd,

Wallyford Roundabout over the railway has been made safer for cycling 🙌 A bit of an odd arrangement of actually going around the roundabout given toucans and then being dumped on Haddington Road down to Musselburgh. But it will link up to the long term Active Toun plans. @edi.bike @spokes.org.uk

BildBildBildBild

Fab to see so many people, from across the community, attend our rally in support of safe routes for kids. As a result of our efforts, the two traffic filters outside JGPS primary school are now permanent and another filter that was under threat has been saved, on Braid Rd 🎉

Seems to be closed between Tesco and the housing estate. Plenty of folk walking through the works anyway and no signed diversion that I could find. It's disappointing to again see no notice for a planned closure on a busy walking and cycling path.

BildBild